Files
Mai/.planning/STATE.md
Mai Development f815f4fecf
Some checks failed
Discord Webhook / git (push) Has been cancelled
docs(02): complete phase execution
Phase 02: Safety & Sandboxing
- 4 plans executed across 3 waves
- Security assessment, sandbox execution, audit logging, integration
- Verification passed - all must-haves verified
- Ready for Phase 3: Resource Management
2026-01-27 16:12:18 -05:00

3.9 KiB

Project State & Progress

Last Updated: 2026-01-27 Current Status: Phase 1 complete - intelligent model switching implemented


Current Position

Aspect Value
Milestone v1.0 Core (Phases 1-5)
Current Phase 03: Resource Management
Current Plan 1 of 4 (next to execute)
Overall Progress 1/15 phases complete
Progress Bar ██████░░░░░░░░░ 20%
Model Profile Budget (haiku priority)

Key Decisions Made

Architecture & Approach

  • Local-first design: All inference, memory, and improvement happens locally — no cloud dependency
  • Second-agent review system: Prevents broken self-modifications while allowing auto-improvement
  • Personality as code + learned layers: Unshakeable core prevents misuse while allowing authentic growth
  • v1 scope: Core systems only (model interface, safety, memory, conversation) before adding task automation

Phase 1 Complete (Model Interface)

  • Model selection strategy: Primary factor is available resources (CPU, RAM, GPU)
  • Context management: Trigger compression at 70% of window, use hybrid approach (summarize old, keep recent)
  • Switching behavior: Silent switching, no user notifications when changing models
  • Failure handling: Auto-start LM Studio if needed, try next best model automatically
  • Discretion: Claude determines capability tiers, compression algorithms, and degradation specifics
  • Implementation: All three plans executed with comprehensive model switching, resource monitoring, and CLI interface

Recent Work

  • 2026-01-26: Created comprehensive roadmap with 15 phases across v1.0, v1.1, v1.2
  • 2026-01-27: Gathered Phase 1 context and created detailed execution plan (01-01-PLAN.md)
  • 2026-01-27: Configured GSD workflow with MCP tools (Hugging Face, WebSearch)
  • 2026-01-27: EXECUTED Phase 1, Plan 1 - Created LM Studio connectivity and resource monitoring foundation
  • 2026-01-27: EXECUTED Phase 1, Plan 2 - Implemented conversation context management and memory system
  • 2026-01-27: EXECUTED Phase 1, Plan 3 - Integrated intelligent model switching and CLI interface
  • 2026-01-27: Phase 1 complete - all models interface and switching functionality implemented
  • 2026-01-27: Phase 2 has 4 plans ready for execution
  • 2026-01-27: EXECUTED Phase 2, Plan 01 - Created security assessment infrastructure with Bandit and Semgrep
  • 2026-01-27: EXECUTED Phase 2, Plan 02 - Implemented Docker sandbox execution environment with resource limits
  • 2026-01-27: EXECUTED Phase 2, Plan 03 - Created tamper-proof audit logging system with SHA-256 hash chains
  • 2026-01-27: EXECUTED Phase 2, Plan 04 - Implemented safety system integration and comprehensive testing
  • 2026-01-27: Phase 2 complete - sandbox execution environment with security assessment, audit logging, and resource management fully implemented

What's Next

Phase 2 complete. Ready for Phase 3: Resource Management Next phase requirements:

  • Detect available system resources (CPU, RAM, GPU)
  • Select appropriate models based on resources
  • Request more resources when bottlenecks detected
  • Graceful scaling from low-end hardware to high-end systems

Status: Phase 3 has 4 plans ready for execution.


Blockers & Concerns

None — all Phase 1 deliverables complete and verified. Moving to safety systems.


Configuration

Model Profile: budget (prioritize haiku for speed/cost) Workflow Toggles:

  • Research: enabled
  • Plan checking: enabled
  • Verification: enabled
  • Auto-push: enabled

MCP Integration:

  • Hugging Face Hub: enabled (model discovery, datasets, papers)
  • Web Research: enabled (current practices, architecture patterns)

Session Continuity

Last session: 2026-01-27T17:34:30Z Stopped at: Completed 01-03-PLAN.md Resume file: None