# State: Vivi Speech Translator **Reference:** See `.planning/PROJECT.md` for full project context **Core Value:** Vivi posts emojis and others instantly understand her without needing to know what each emoji means. **Last Updated:** 2025-01-29 --- ## Current Position **Phase:** Roadmap complete, ready for Phase 1 planning **Focus:** Foundation (PluralKit detection + database setup) **Timeline:** 5-6 weeks to v1 (33 requirements, 5 phases) --- ## Project Status | Aspect | Status | Notes | |--------|--------|-------| | **Requirements** | 33 defined ✓ | All v1 requirements mapped to phases | | **Research** | Complete ✓ | Stack, Features, Architecture, Pitfalls synthesized | | **Roadmap** | Complete ✓ | 5 phases, 100% coverage, dependencies identified | | **Phase 1 Plan** | Awaiting | Ready to run `/gsd:plan-phase 1` | | **Team** | 1 person (user) + Claude | Solo developer + AI pair programming | --- ## Coverage Summary **v1 Requirements:** 33 total - Message Detection: 4 (DETECT-01 through DETECT-04) - Emoji Parsing & Translation: 6 (TRANS-01 through TRANS-06) - Teaching System: 7 (TEACH-01 through TEACH-07) - Unknown Emoji Handling: 3 (UNK-01 through UNK-03) - Error Handling: 3 (ERROR-01 through ERROR-03) - Configuration: 4 (CONFIG-01 through CONFIG-04) - Database & Persistence: 4 (DB-01 through DB-04) - Accessibility: 5 (A11Y-01 through A11Y-05) - Generalization: 3 (GEN-01 through GEN-03) **Phase Mapping:** - Phase 1 (Foundation): 5 requirements - Phase 2 (Translation Engine): 13 requirements - Phase 3 (Teaching System): 14 requirements - Phase 4 (Configuration): 5 requirements - Phase 5 (Polish): 2 requirements **Coverage:** 100% ✓ (all 33 mapped, no orphans) --- ## Roadmap at a Glance ``` Phase 1: Foundation (Weeks 1-2) Goal: Detect Vivi via PluralKit, set up database Success: >99% detection accuracy, zero false positives Phase 2: Translation Engine (Weeks 3-4) Goal: Parse emojis, translate to text, auto-translate Success: <500ms response, 100% Unicode emoji parse accuracy Phase 3: Teaching System (Weeks 5-6) Goal: Let users teach emoji meanings via simple commands Success: Teaching interface usable, 50+ emoji taught in beta Phase 4: Configuration & Scaling (Week 7) Goal: Per-server auto/on-demand toggle Success: Settings persist, multi-server support verified Phase 5: Production Polish (Week 8+) Goal: Logging, retry logic, production hardening Success: <0.1% error rate, all failures logged ``` --- ## Key Decisions Made 1. **Global emoji dictionary** (not per-server) — Shared knowledge across communities; per-server overrides defer to v2 2. **Learning-based system** — Users teach emoji meanings; no manual mapping 3. **Webhook dispatch for PluralKit** — Instant (vs API polling); free and efficient 4. **Auto mode as default** — More accessible for Vivi (no extra action) 5. **Plain text responses only** — Accessibility for dysgraphia 6. **Five-phase structure** — Each phase delivers measurable value --- ## Known Risks & Mitigations | Risk | Severity | Phase | Mitigation | |------|----------|-------|-----------| | PluralKit detection unreliable | CRITICAL | 1 | Webhook verification + API validation; comprehensive testing | | Teaching interface too complex | HIGH | 3 | Ultra-simple syntax; visual confirmation; test with Vivi | | Emoji parsing edge cases | MEDIUM | 2 | Use emoji library; test Unicode 15.0 samples | | Rate limiting impacts | MEDIUM | 2+ | Cache emoji; batch lookups; backoff strategy | | Dictionary quality degrades | HIGH | 3+ | Audit trail; input validation; flag conflicts | --- ## Upcoming Milestones **Phase 1 Planning** (Next: `/gsd:plan-phase 1`) - Create detailed execution plan for Foundation phase - Derive must-haves from success criteria - Define acceptance tests **Phase 1 Delivery** (Weeks 1-2) - PluralKit detection working >99% accuracy - Database initialized and queryable - Proof of concept: bot logs Vivi's messages **Phase 2 Delivery** (Weeks 3-4) - Emoji parsing and translation working - Auto-translate mode enabled - MVP ready for early user testing **Phase 3 Delivery** (Weeks 5-6) - Teaching system accessible to Vivi - 50+ emoji taught by community - Core value delivered: "Vivi posts, others understand" --- ## Implementation Context **Tech Stack:** - discord.py 2.6.4 (Python async Discord bot framework) - SQLite MVP → PostgreSQL for production - aiosqlite (async database) - emoji 2.11.0 (Unicode support) - Railway Cloud (free tier hosting) **Code Location:** To be initialized in Phase 1 planning **Database Location:** SQLite for MVP; will be in project root or `.data/` directory **Hosting:** Railway Cloud free tier ($0-5/month for MVP) --- ## Communication & Decisions **User Input Needed:** - Vivi's teaching interface preferences (syntax, visual feedback, response length) - Exact emoji coverage (standard + custom Discord emoji examples) - Moderation preferences (who can teach, conflict resolution) **Architecture Locked In:** - Global emoji dictionary (v1) with per-system overrides planned for v2 - PluralKit webhook detection over API polling - discord.py 2.6.4 with slash commands as primary interface **Open for Discussion:** - Response format preferences (e.g., "Vivi: sick" vs "Vivi is sick") - Caching strategy (hot emoji in memory vs all DB lookups) - Logging verbosity (debug level for early phases) --- ## Progress Tracker **Completed:** - ✓ Research synthesis (STACK.md, FEATURES.md, ARCHITECTURE.md, PITFALLS.md) - ✓ Requirements definition (33 v1 requirements) - ✓ Roadmap creation (5 phases, 100% coverage) - ✓ Phase-level success criteria (observable user behaviors) **In Progress:** - → Phase 1 planning (breakdown into executable tasks) **Pending:** - Vivi interview for UX validation (Phase 3) - Phase 1 implementation - Early user testing (post-Phase 2) - Performance profiling (post-Phase 3) --- ## Next Steps 1. **Review ROADMAP.md** — Confirm 5-phase structure and dependencies 2. **Run `/gsd:plan-phase 1`** — Create execution plan for Foundation 3. **Initialize Phase 1 code** — Discord client, PluralKit detection, database 4. **Get Vivi input** — Teaching interface preferences (Phase 3 planning) --- **Status:** Ready for Phase 1 planning **Confidence Level:** ⭐⭐⭐ HIGH (research complete, requirements clear, stack proven) **Blockers:** None — proceeding to Phase 1 planning --- *Generated: 2025-01-29* *Roadmap: .planning/ROADMAP.md* *Requirements: .planning/REQUIREMENTS.md*