Files
Vivi-Speech/.planning/STATE.md
Dani B 3e89f67666 docs: create 5-phase roadmap with 33 requirements mapped
- Phase 1 (Foundation): PluralKit detection + database setup
- Phase 2 (Translation Engine): Emoji parsing + auto-translate
- Phase 3 (Teaching System): User commands to learn emoji meanings
- Phase 4 (Configuration): Per-server settings + scaling
- Phase 5 (Polish): Logging + production hardening

100% requirement coverage: all 33 v1 requirements mapped to exactly one phase.
Dependencies identified: Phase 1 → 2 → 3 → 4 → 5

Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com>
2026-01-29 11:08:02 -05:00

6.4 KiB

State: Vivi Speech Translator

Reference: See .planning/PROJECT.md for full project context

Core Value: Vivi posts emojis and others instantly understand her without needing to know what each emoji means.

Last Updated: 2025-01-29


Current Position

Phase: Roadmap complete, ready for Phase 1 planning

Focus: Foundation (PluralKit detection + database setup)

Timeline: 5-6 weeks to v1 (33 requirements, 5 phases)


Project Status

Aspect Status Notes
Requirements 33 defined ✓ All v1 requirements mapped to phases
Research Complete ✓ Stack, Features, Architecture, Pitfalls synthesized
Roadmap Complete ✓ 5 phases, 100% coverage, dependencies identified
Phase 1 Plan Awaiting Ready to run /gsd:plan-phase 1
Team 1 person (user) + Claude Solo developer + AI pair programming

Coverage Summary

v1 Requirements: 33 total

  • Message Detection: 4 (DETECT-01 through DETECT-04)
  • Emoji Parsing & Translation: 6 (TRANS-01 through TRANS-06)
  • Teaching System: 7 (TEACH-01 through TEACH-07)
  • Unknown Emoji Handling: 3 (UNK-01 through UNK-03)
  • Error Handling: 3 (ERROR-01 through ERROR-03)
  • Configuration: 4 (CONFIG-01 through CONFIG-04)
  • Database & Persistence: 4 (DB-01 through DB-04)
  • Accessibility: 5 (A11Y-01 through A11Y-05)
  • Generalization: 3 (GEN-01 through GEN-03)

Phase Mapping:

  • Phase 1 (Foundation): 5 requirements
  • Phase 2 (Translation Engine): 13 requirements
  • Phase 3 (Teaching System): 14 requirements
  • Phase 4 (Configuration): 5 requirements
  • Phase 5 (Polish): 2 requirements

Coverage: 100% ✓ (all 33 mapped, no orphans)


Roadmap at a Glance

Phase 1: Foundation (Weeks 1-2)
  Goal: Detect Vivi via PluralKit, set up database
  Success: >99% detection accuracy, zero false positives

Phase 2: Translation Engine (Weeks 3-4)
  Goal: Parse emojis, translate to text, auto-translate
  Success: <500ms response, 100% Unicode emoji parse accuracy

Phase 3: Teaching System (Weeks 5-6)
  Goal: Let users teach emoji meanings via simple commands
  Success: Teaching interface usable, 50+ emoji taught in beta

Phase 4: Configuration & Scaling (Week 7)
  Goal: Per-server auto/on-demand toggle
  Success: Settings persist, multi-server support verified

Phase 5: Production Polish (Week 8+)
  Goal: Logging, retry logic, production hardening
  Success: <0.1% error rate, all failures logged

Key Decisions Made

  1. Global emoji dictionary (not per-server) — Shared knowledge across communities; per-server overrides defer to v2
  2. Learning-based system — Users teach emoji meanings; no manual mapping
  3. Webhook dispatch for PluralKit — Instant (vs API polling); free and efficient
  4. Auto mode as default — More accessible for Vivi (no extra action)
  5. Plain text responses only — Accessibility for dysgraphia
  6. Five-phase structure — Each phase delivers measurable value

Known Risks & Mitigations

Risk Severity Phase Mitigation
PluralKit detection unreliable CRITICAL 1 Webhook verification + API validation; comprehensive testing
Teaching interface too complex HIGH 3 Ultra-simple syntax; visual confirmation; test with Vivi
Emoji parsing edge cases MEDIUM 2 Use emoji library; test Unicode 15.0 samples
Rate limiting impacts MEDIUM 2+ Cache emoji; batch lookups; backoff strategy
Dictionary quality degrades HIGH 3+ Audit trail; input validation; flag conflicts

Upcoming Milestones

Phase 1 Planning (Next: /gsd:plan-phase 1)

  • Create detailed execution plan for Foundation phase
  • Derive must-haves from success criteria
  • Define acceptance tests

Phase 1 Delivery (Weeks 1-2)

  • PluralKit detection working >99% accuracy
  • Database initialized and queryable
  • Proof of concept: bot logs Vivi's messages

Phase 2 Delivery (Weeks 3-4)

  • Emoji parsing and translation working
  • Auto-translate mode enabled
  • MVP ready for early user testing

Phase 3 Delivery (Weeks 5-6)

  • Teaching system accessible to Vivi
  • 50+ emoji taught by community
  • Core value delivered: "Vivi posts, others understand"

Implementation Context

Tech Stack:

  • discord.py 2.6.4 (Python async Discord bot framework)
  • SQLite MVP → PostgreSQL for production
  • aiosqlite (async database)
  • emoji 2.11.0 (Unicode support)
  • Railway Cloud (free tier hosting)

Code Location: To be initialized in Phase 1 planning

Database Location: SQLite for MVP; will be in project root or .data/ directory

Hosting: Railway Cloud free tier ($0-5/month for MVP)


Communication & Decisions

User Input Needed:

  • Vivi's teaching interface preferences (syntax, visual feedback, response length)
  • Exact emoji coverage (standard + custom Discord emoji examples)
  • Moderation preferences (who can teach, conflict resolution)

Architecture Locked In:

  • Global emoji dictionary (v1) with per-system overrides planned for v2
  • PluralKit webhook detection over API polling
  • discord.py 2.6.4 with slash commands as primary interface

Open for Discussion:

  • Response format preferences (e.g., "Vivi: sick" vs "Vivi is sick")
  • Caching strategy (hot emoji in memory vs all DB lookups)
  • Logging verbosity (debug level for early phases)

Progress Tracker

Completed:

  • ✓ Research synthesis (STACK.md, FEATURES.md, ARCHITECTURE.md, PITFALLS.md)
  • ✓ Requirements definition (33 v1 requirements)
  • ✓ Roadmap creation (5 phases, 100% coverage)
  • ✓ Phase-level success criteria (observable user behaviors)

In Progress:

  • → Phase 1 planning (breakdown into executable tasks)

Pending:

  • Vivi interview for UX validation (Phase 3)
  • Phase 1 implementation
  • Early user testing (post-Phase 2)
  • Performance profiling (post-Phase 3)

Next Steps

  1. Review ROADMAP.md — Confirm 5-phase structure and dependencies
  2. Run /gsd:plan-phase 1 — Create execution plan for Foundation
  3. Initialize Phase 1 code — Discord client, PluralKit detection, database
  4. Get Vivi input — Teaching interface preferences (Phase 3 planning)

Status: Ready for Phase 1 planning

Confidence Level: HIGH (research complete, requirements clear, stack proven)

Blockers: None — proceeding to Phase 1 planning


Generated: 2025-01-29 Roadmap: .planning/ROADMAP.md Requirements: .planning/REQUIREMENTS.md